
Empire Wind 1
Equinor
Long Island, New York
Atlantic Ocean, United States
We manufactured the 54 transition pieces at our sites in Poland and Belgium. Assembly and full outfitting of the TPs took place our yard in Hoboken, Belgium.
The load-out phase began in early 2025. The offshore foundation installation campaign started in the summer of that year.
Once operational, the 54 wind turbines will generate 810 MW, providing sustainable energy to around 500,000 homes.

