OSS Jasmund
50Hertz
Baltic Sea, Germany
The construction of the topside for Windanker Offshore Wind Farm took place at HSM Offshore Energy's Stormpolder yard. We built and assembled the jacket entirely at our yard in Vlissingen.
The works on the topside started in March 2024. Prefabrication of the jacket started in July 2024.
The Jasmund substation is located in the Windanker Offshore Wind Farm and northeast of Rügen Island, about 100 km off the coast of Lubmin in Germany. The substation has a capacity of 300 megawatts (MW), which can provide electricity for around 260,000 households.