Civil & Industry
References
For this project, Smulders delivered and placed the two lock gates and a bridge. The bridge was installed on a temporary location. Two years later, it was installed on its final location.
Project data:
- Client: Rijkswaterstaat / Strukton Civiel
- Weight: 584 tons