Wintrack III

 

Delivering pylons or high-voltage pylons - our cup of tea. Even if the concept was a new type of mast such as Wintrack III, good for 4 circuits 380 kV. A civil engineering project commissioned by TenneT, which was building a high-voltage connection from Eemshaven to Vierverlaten near Groningen to reinforce the existing grid. After a remarkable process, TenneT chose Iemants to execute 130 pylons (65 mast positions).

 

The connection ensured that more electricity could be transported from the Eemshaven energy hub to Groningen and further to other parts of the Netherlands.

 

Read more about this project in our magazine