Offshore Oil & Gas
References
Smulders was responsible for the production and the painting of a steel construction (poles) for the LNG Pier in the sea off the coast of Libya. The 446 poles each weigh +/- 50 tons and their dimensions are 50m x 65m.
Project data:
- Client: Agip gas
- Weight: 17,500 tons