Smulders delivered and assembled the steel construction of 30 frame structures of ca. 25T, which were installed in projection. All the frame structures were assembled with counter level. The roof trusses of 40 meter long and 8 meter high and a weight of 60T were transported by ship. For their assembly a complete scenario was elaborated (position heavy crane, order, etc...)
Furthermore, there were also some classic steel structures that were delivered for the pavillions.
Project data:
- Client: City Antwerp
- Contractor: THV - MAS Antwerp (Interbuild - Willemen - Cordeel)
- Weight: 1,100 tons