Offshore Oil & Gas
References
Smulders was responsible for the design, production, corrosion protection and assembly of stinger handling frame and stinger handling system. Because of that, a bulk carrier was converted to a ship for laying pipelines in the sea (Audacia).
Project data:
- Client: Allseas
- Weight: 950 tonnes