Offshore Wind
References
In 2014 Smulders produced 43 transition pieces for the Eneco Luchterduinen Offshore Wind Farm.
Eneco Luchterduinen is situated 23 km off the coast between Noordwijk and Zandvoort and is operational since 2015.
Project data:
- Client: Van Oord
- Utility: Eneco
- Wind turbine type: Vestas V112-3.0 MW
- Number of transition pieces: 43