Offshore Wind
References
Smulders was responsible for the construction of 2 topsides and 2 jackets for Gode Wind Offshore Wind Farm.
The topsides and jackets were successfully installed in June 2015.
Project data:
- Client: Dong Energy
- Utility: Dong Energy
- Weight topsides: 2 x 915 tons
- Weight jackets: 2 x 1,875 tons
- Weight piles: 2 x 880 tons