Offshore Wind
References
Smulders designed, produced and assembled a topside and jacket for the West of Duddon Sands Offshore Wind Farm. The wind farm is located 14 km South West of Walney island on the coast of Barrow-in-Furness.
The topside was installed in May 2013. It is operational since October 2014.
Project data:
- Client: Dong Energy
- Utility: Dong Energy
- Weight topside: 1,850 tons
- Weight jacket: 1,250 tons