As part of the renovation of the boulevard in Cadzand-Bad, we delivered a steel pedestrian bridge with a length of 80 m. The bridge and columns were preassembled at Smulders in Balen and transported to Cadzand. Installation of the bridge took place on 14 June 2016.
Project data:
- Client: BAM Utiliteitsbouw
- Weight: 140 tons