Offshore Wind
References
Smulders was, together with Sif Group, in charge of producing 71 transition pieces for the EnBW Hohe See Offshore Wind Farm. Sif produced the primary steel, while Smulders was responsible for the further production and assembly of the transition pieces.
Project data:
- Client: DEME
- Nr of transition pieces 71
- Dimensions diameter up to 7.4 m / Height: +28 m