Polbrug
Zutphen, The Netherlands
2012
Polbrug

Smulders was responsible for the construction of a new bridge over the Twentecanal. The entire bridge was produced in sections at Smulders. These elements were assembled on a prefabrication location next to the harbour in Zutphen, a few kilometers from the final position. Eventually, the bridge was ridden from the quay on a pontoon after which the bridge was navigated into place during the weekend and during closure of the IJssel and the Twentecanal. 

 

Project data:

 

  • Client: Combinatie Strukton Civiel - Reef Infra bv
  • Weight: 1,000 tons
  • Overspanning: 117 meter